New Report Provides Insights on Setting up a Biomass Gasification Plant - San Diego, California News Station - KFMB Channel 8 - cbs8.com

New Report Provides Insights on Setting up a Biomass Gasification Plant

Posted: Updated:
“Prefeasibility Report on a Biomass Gasification Plant”
A new report released by IMARC Group provides a techno-commercial roadmap for setting up a biomass gasification plant. This ranges from macro overview of the market to micro details of the industry performance, processing and manufacturing requirements, project cost, project funding, project economics, infrastructure requirements, revenues, expected returns on investment, profit margins, etc.

IMARC’s latest study “Prefeasibility Report on a Biomass Gasification Plant” provides a techno-commercial roadmap for setting up a biomass gasification plant. The study, which has been done by one of the world’s leading research and advisory firms, covers all the requisite aspects of the biomass gasification industry. This ranges from macro overview of the market to micro details of the industry performance, processing and manufacturing requirements, project cost, project funding, project economics, expected returns on investment, profit margins, etc. This report is a must-read for entrepreneurs, investors, researchers, consultants, business strategists and all those who are planning to foray into the biomass gasification industry in any manner.

Key Questions Answered in This Report?

  • What are the key success and risk factors in the biomass gasification industry?
  • How has the biomass gasification market performed so far and how will it perform in the coming years?
  • What is the structure of the biomass gasification industry and who are the key players?
  • What are the various unit operations involved in a biomass gasification plant?
  • What is the total size of land required for setting up a biomass gasification plant?
  • What are the machinery requirements for setting up a biomass gasification plant?
  • What are the raw material requirements for setting up a biomass gasification plant?
  • What are the utility requirements for setting up a biomass gasification plant?
  • What are the manpower requirements for setting up a biomass gasification plant?
  • What are the infrastructure costs for setting up a biomass gasification plant?
  • What are the capital costs for setting up a biomass gasification plant?
  • What are the operating costs for setting up a biomass gasification plant?
  • What will be the income and expenditures for a biomass gasification plant?
  • What is the time required to break-even?


Table of Contents

1 Research Methodology
2 Executive Summary
3 Introduction
4 Biomass Gasification: Industry Analysis
4.1 Biomass Gasification Industry: Key Success and Risk Factors
4.2 Biomass Gasification Industry: Overall Market Performance
4.2.1 Global Power Generation Market
4.2.1.1 Historical and Current Market Trends
4.2.1.2 Market by Source
4.2.1.3 Market by Region
4.2.2 Global Biomass Power Generation Market
4.2.2.1 Historical and Current Market Trends
4.2.2.2 Market by Source
4.2.2.3 Market by Region
4.2.3 Market Outlook
4.2.4 Key Players
5 Biomass Gasification Process
5.1 Biomass Gasification Plant: Detailed Process Flow
5.2 Biomass Gasification Plant: Various Types of Unit Operations Involved
6 Project Details, Requirements and Costs Involved
6.1 Land, Location and Site Development
6.2 Plant Machinery
6.3 Raw Materials
6.4 Utilities
6.5 Manpower
6.6 Other Capital Investments
7 Biomass Gasification Plant: Loans and Financial Assistance
8 Biomass Gasification Plant: Project Economics
8.1 Capital Cost of the Project
8.2 Techno-Economic Parameters
8.3 Pricing
8.4 Income Projections
8.5 Expenditure Projections
8.6 Financial Analysis

List of Figures

Figure 4.1: Global: Electricity Production (in TWh), 2009-2013
Figure 4.2: Global: Electricity Production: Breakup by Source (in %), 2013
Figure 4.3: Global: Electricity Production: Breakup by Region (in %), 2013
Figure 4.4: Global: Biomass Electricity Production (in TWh), 2009-2013
Figure 4.5: Global: Biomass Electricity Production: Breakup by Source (in %), 2013
Figure 4.6: Global: Biomass Electricity Production: Breakup by Region (in %), 2013
Figure 4.7: Global: Electricity Production Forecast (in TWh), 2014-2019
Figure 4.8: Global: Biomass Electricity Production Forecast (in TWh), 2014-2019
Figure 5.1: Biomass Gasification Process: Conversion Rates of Products and By Products
Figure 5.2: Biomass Gasification Process
Figure 8.1: Biomass Gasification Plant: Breakup of Capital Costs (in %)
Figure 8.2: Biomass Gasification Plant: Breakup of Operating Costs (in %)

List of Tables

Table 4.1: Global: Major Biomass Gasifiers and their Capacities (in MWh)
Table 6.1: Biomass Gasification Plant: Costs Related to Land and Site Development (in US$
Table 6.2: Biomass Gasification Plant: Costs Related to Civil Works (in US$)
Table 6.3: Biomass Gasification Plant: Machinery Costs (in US$)
Table 6.4: Biomass Gasification Plant: Raw Material Requirements (in Tons/Day)
Table 6.5: Biomass Gasification Plant: Costs Related to Salaries and Wages (in US$
Table 6.6: Biomass Gasification Plant: Costs Related to Other Capital Investments (in US$)
Table 7.1: Details of Financial Assistance Offered by Financial Institutions
Table 8.1: Biomass Gasification Plant: Capital Costs (in US$)
Table 8.2: Biomass Gasification Plant: Techno-Economic Parameters
Table 8.3: Biomass Gasification Plant: Income Projections (in US$)
Table 8.4: Biomass Gasification Plant: Expenditure Projections (in US$)
Table 8.5: Biomass Gasification Plant: Cash Flow Analysis Without Considering the Income Tax Liability
Table 8.6: Biomass Gasification Plant: Cash Flow Analysis on Considering the Income Tax Liability


To buy the complete report or to get a free sample, please contact:

IMARC Group Asia:
Email: apac@imarcgroup.com
Phone: +91-120-415-5099

IMARC Group North America:
Email: america@imarcgroup.com
Phone: +1-631-791-1145

IMARC Group Europe, Middle East & Africa:
Email:ema@imarcgroup.com
Phone: +44-702-409-7331


To know more please visit:
http://www.imarcgroup.com/prefeasibility-report-biomass-gasification-plant/

Media Contact
Company Name: IMARC Group
Contact Person: Krishna Sharma
Email: Send Email
Phone: +91-120-415-5099
City: Noida
State: Uttar Pradesh
Country: India
Website: http://www.imarcgroup.com/

Source: www.abnewswire.com

ReleaseID: 13670

  • Local NewsMore>>

  • Unconscious man pulled from Oceanside beach

    Unconscious man pulled from Oceanside beach

    Sunday, September 14 2014 10:02 PM EDT2014-09-15 02:02:55 GMT
    A man died at a hospital Sunday after he was pulled unconscious from the water at an Oceanside beach. 
    A man died at a hospital Sunday after he was pulled unconscious from the water at an Oceanside beach. 
  • Sick passenger airlifted from cruise ship

    Sick passenger airlifted from cruise ship

    Sunday, September 14 2014 10:01 PM EDT2014-09-15 02:01:36 GMT
    A 34-year-old man suffering from appendicitis symptoms aboard a cruise ship was evacuated to a San Diego hospital Sunday for emergency medical treatment. 
    A 34-year-old man suffering from appendicitis symptoms aboard a cruise ship was evacuated to a San Diego hospital Sunday for emergency medical treatment. 
  • Triple-digit temperatures hit San Diego

    Triple-digit temperatures hit San Diego

    Sunday, September 14 2014 8:39 PM EDT2014-09-15 00:39:54 GMT
    Temperatures on the field at Qualcomm Stadium were well above 100 degrees before Sunday's NFL kickoff, while most San Diego Unified School District students will get out of school early Monday due to the heat wave. 
    Temperatures on the field at Qualcomm Stadium were well above 100 degrees before Sunday's NFL kickoff, while most San Diego Unified School District students will get out of school early Monday due to the heat wave. 
Powered by WorldNow
All content © Copyright 2000 - 2014 WorldNow and Midwest Television, Inc. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.